Our last major building project was undertaken 50 years ago. This means that there are a host of tasks that are necessary to maintain our older buildings. The current list is a diverse collection of ways that you can help at St. John’s!
- Clean Up/Clean Out: There is ALWAYS something that needs to be cleaned or organized at St. John’s. Recently volunteers were working to clean-up numerous items leftover from the Project Welcome efforts at church. But there is ALWAYS something to clean and organize … especially storage areas. These include:
- School Boiler Room (especially in the old incinerator room. Yes, our school has an old incinerator for trash that hasn’t been used in many, many years!)
- Trustees Storage Room in the basement (a collection of miscellaneous items, many of which are no longer needed)
- Gymnasium Storage Room (some trash, dust and other items as well as a collection of stuff that needs sorting)
- Church janitor’s closet (some old cleaning supplies, paper goods, etc.)
- Ladies’ Lounge (old electronics, patch cables and a collection of other items that need a new home, including the dumpster for some items)
- There are numerous smaller items that could use some work
- CEILING TILES: A plumber recently repaired some pipes in the ceiling of the school basement. Now that the work is complete we need a volunteer (or two) to replace damaged ceiling tiles. All that is needed is a straight-edge and a razor knife!
- COVER PLATES: This summer, workers installed additional components for our access control system. There are more than a dozen electrical boxes that need a new cover. A screwdriver and step ladder (which we will provide) is really all that is necessary.
- PAINTING: If it is not too cold, the posts from the old gate could be painted to match the new safety bollards. The posts no longer hold up a gate, but they provide additional protection from traffic hitting the new gate and posts.
- Assistance:
- RETRACTABLE GATE: Skilled workers will lead a small crew to complete work for our new retractable gate, including the installation of an “exit loop” which means the gate will automatically open when a vehicle needs to exit the back parking area.
- PIPE INSULATION: Roof drains help remove water from our school’s roof, but when cold water from snow melt comes through the pipe located near the ceiling, condensation can create problems. A skilled worker can train (or assist) several others with accomplishing this task.
As always, contact Pastor Albers for more details and to receive the contact information of the staff member or volunteer who is helping to manage the project.
Read more from St. John's
Save the date: Family Reunion Sunday
Check out the plan for the Family Reunion Sunday on August 30th, beginning with worship at 10am. To check how you can help, the list of needed volunteers is also included here.
Blood Drive at St. John’s
Sign up now to donate blood on Family Reunion Sunday, as the American Red Cross has declared a national blood crisis and faces an emergency shortage.
Interviews Beginning for the Associate Pastor Call Process
The Call Process is moving forward as four names have been selected to be interviewed. More information on the plans for that interview process are shared here. If you would like to attend the…
The Story of the Stained Glass
Check out this series of articles describing the teachings behind the stained glass windows at St. John’s! This month, Pastor shares the meaning behind a small group of the disciples.


